TICGL

| Economic Consulting Group

TICGL | Economic Consulting Group

TANROADS’ top 10 infrastructure projects, valued at 1,846.422 Billion TZS, highlight a strategic focus on transformative investments between 2015 and 2021. The J.P. Magufuli Bridge, the most expensive project at 592.609 Billion TZS, underscores the prioritization of specialized, high-impact infrastructure. While projects like BRT Phase 2 Lot 1 focus on urban mobility with a cost of 189.4 Billion TZS, rural connectivity is efficiently addressed through cost-effective roadworks such as Komanga-Kasinde LOT2 and Kasinde-Mpanda LOT3, averaging just 1.24 Billion TZS/km. These investments reflect TANROADS’ commitment to improving transport, trade, and regional integration across Tanzania.

1. J.P. Magufuli Bridge

2. BRT Phase 2 Lot 1

3. Lusitu-Mawengi LOT2

4. Usesule-Komanga LOT1

5. Widening of Morogoro Road (Kimara–Kibaha)

6. Komanga-Kasinde LOT2

7. Kasinde-Mpanda LOT3

8. LOT 2: Ihumwa Dry Port – Matumbulu – Nala Section

9. Moronga-Makete LOT2

10. LOT 1: Nala – Veyula – Mtumba – Ihumwa Dry Port Section

Key Observations and Trends

1. Cost Distribution

2. Timeline Pattern

3. Project Types

4. Cost Efficiency

5. Geographic Distribution

The analysis of the top 10 TANROADS projects provides several insights into Tanzania's infrastructure priorities and investment strategy:

1. Strategic Investment Priorities

2. Cost Efficiency and Project Complexity

3. Timeline and Budget Focus

4. Geographic Distribution

5. Infrastructure and Economic Growth Link

TANROADS is executing a deliberate strategy to prioritize impactful, high-value projects that address both urban and rural needs. By focusing on cost efficiency, geographic inclusivity, and economic relevance, these projects significantly enhance Tanzania’s infrastructure, trade capacity, and economic growth potential.

Top 10 TANROADS Projects by Contract Value (2015–2021):

RankProject NameContract Value (Billion TZS)Signing DateLength (km)Cost per km (Billion TZS)Key Highlights
1J.P. Magufuli Bridge592.60929/07/20193.20185.19Most expensive project, critical national transport link.
2BRT Phase 2 Lot 1189.40010/12/201820.309.33Urban transit infrastructure for Dar es Salaam.
3Lusitu-Mawengi LOT2159.21722/08/201650.003.18Enhances regional connectivity.
4Usesule-Komanga LOT1158.80012/11/2017117.671.35Large-scale, cost-efficient rural connectivity project.
5Widening of Morogoro Road (Kimara–Kibaha)140.45013/07/201819.207.32Urban road widening to reduce congestion and enhance trade flow.
6Komanga-Kasinde LOT2140.00012/11/2017112.801.24Efficient road project supporting rural regions.
7Kasinde-Mpanda LOT3133.80012/11/2017108.001.24Complements Komanga-Kasinde project to strengthen connectivity.
8LOT 2: Ihumwa Dry Port – Matumbulu – Nala120.86014/02/202060.002.01Improves logistics for trade efficiency.
9Moronga-Makete LOT2110.44606/02/201753.502.06Supports regional transport connectivity.
10LOT 1: Nala – Veyula – Mtumba – Ihumwa100.84010/07/202052.301.93Facilitates transport and logistics efficiency.

Key Observations:

crossmenu linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram