Between 2015 and 2021, TANROADS has strategically increased infrastructure investments, focusing on high-value projects to drive Tanzania's economic growth. Over this period, the total investment reached 3,264.173 Billion TZS, with a peak average project value of 119.40 Billion TZS per project in 2019. In 2021, despite only 4 projects, the average remained high at 81.41 Billion TZS per project, emphasizing a shift toward impactful, large-scale infrastructure that strengthens national and regional connectivity.

Yearly Breakdown

2021

2020

2019

2018

2017

2016

2015 and Earlier

Insights

  1. Peak Year: The highest average project value was in 2019, highlighting significant investments in high-value infrastructure.
  2. Earlier Projects: Projects before 2015 had much lower average values, reflecting either smaller scopes or older pricing trends.
  3. Consistent Growth: Recent projects (2020–2021) show a steady increase in total project values with relatively fewer but higher-value contracts.

The figures reveals key insights about TANROADS' project trends and priorities over the years:

1. Investment Growth Over Time

2. Recent Trends (2020–2021)

3. Earlier Years (2015 and Before)

4. Long-Term Trends

What This Means

The top 10 projects by contract value.

RankProject NameYearContract Sum (Bil TZS)
1J.P. Magufuli Bridge2019592.609
2BRT Phase 2 Lot 12018189.400
3LUSITU-MAWENGI LOT22016159.217
4USESULE-KOMANGA LOT12017158.800
5WIDENING OF MOROGORO ROAD (KIMARA –KIBAHA)2018140.450
6KOMANGA KASINDE LOT22017140.000
7KASINDE-MPANDA LOT32017133.800
8LOT 2: IHUMWA DRY PORT – MATUMBULU – NALA SECTION2020120.860
9LOT 1: NALA – VEYULA – MTUMBA – IHUMWA DRY PORT SECTION2020100.840
10MORONGA-MAKETE LOT22017110.446

Key observations: